Flyover bridge in Poznań

Due to the insufficient load-bearing capacity of the existing permanent crossing, we delivered a temporary bridge which, when installed directly above the existing bridge, will enable the passage of heavy equipment (100% Eurocode LM1).

Teilen auf:

Einzelheiten zum Projekt

Lösungen
Trägerbrücke
Typ
JSK-JBB
Länge
13,5m
Breite
3,6m
Tragkraft
Eurocode LM1
Trägerbrücke